Delivery Process: ASUM-DM
An iterative IBM SPSS Process to implement a Data Mining/Predictive Analytics project based on an extended and refined CRISP-DM methodology (click the "Description" tab below for more details) .

IBM Analytics methodology "Analytics Solutions Unified Method (ASUM)" has five phases: Analyze, Design, Configure & Build, Deploy, and Operate & Optimize. However, the three phases of ASUM of Anlyze, Design, and Configure & Build have been combined here due to the iterative nature of data mining/predictive analytics projects.

The method Work Breakdown Structure (WBS) already incorporates adequate project management elements but an additional optional Project Management Process has been added here for supplemental use when needed.
DescriptionWork Breakdown StructureTeam AllocationWork Product Usage
Workflow
                                                                     Analyze-Design-Configure&Build Analyze-Design-Configure&Build Analyze-Design-Configure&Build Operate & Optimize Deploy Project Management
Work Breakdown